Skip to main content

Case Study (2)
Ideal Foundation Systems Blog

Helical Piles | Case Study | Helical Case Study

943 Helical Pipe Piles for an Active Fuel Dispensary With Sinkhole Activity

August 3rd, 2017|1 min read

Case Study | Drilled-In Displacement Piles (DDM) | STELCOR

STELCOR® DDM For 8-Story Building in Brooklyn

June 29th, 2016|1 min read

Case Study | Drilled-In Displacement Piles (DDM) | STELCOR

NYC – 92 STELCOR® DDM in Difficult Soils in The Bronx

March 30th, 2016|1 min read

Case Study | Drilled-In Displacement Piles (DDM) | STELCOR

NYC – 60 STELCOR® DDM For 5-Story Housing Units In Astoria

January 29th, 2016|1 min read

Case Study | Drilled-In Displacement Piles (DDM) | STELCOR

STELCOR® Piles at 14-Story Draper Hall in NYC

January 13th, 2016|0 min read

Case Study | Drilled-In Displacement Piles (DDM)

5 And 7 Story Buildings For NYC HPD Will Stand On STELCOR Drilled-In Displacement Micropiles In the Bronx

November 6th, 2015|1 min read

Helical Piles | Case Study | Helical Case Study

10.75″ Helical Pipe Piles for 22 Story Tower in Long Island City, NY

October 13th, 2015|1 min read

Case Study | Drilled-In Displacement Piles (DDM) | STELCOR

CASE STUDY | Long Beach, NY | 257 STELCOR Piles

July 24th, 2015|1 min read

Case Study | Drilled-In Displacement Piles (DDM) | STELCOR

CASE STUDY | Sunnyside, WA | IDEAL STELCOR Pile

March 27th, 2015|1 min read