Skip to main content

Case Study
Ideal Foundation Systems Blog

Helical Piles | Case Study | Helical Case Study

5.5″ HELICAL PILES FOR A HOSPITAL PARKING GARAGE RETROFIT

December 28th, 2022|2 min read

Limited Access | Low Headroom | Case Study | Drilled-In Displacement Piles (DDM) | STELCOR

STELCOR® DDMS TOUCHING DOWN AT JFK AIRPORT

October 31st, 2022|2 min read

Case Study | Drilled-In Displacement Piles (DDM)

42 STELCOR® DDMS FOR WIND TURBINES IN CALIFORNIA

July 25th, 2022|2 min read

Case Study | Drilled-In Displacement Piles (DDM)

FLYING EXCAVATORS AND STELCOR DDM’S AT A PAPER MILL IN DULUTH, MN

June 29th, 2022|3 min read

Case Study | Drilled-In Displacement Piles (DDM)

93 STELCOR DDM’S INSTALLED FOR A 7-STORY HOSPITAL ADDITION

March 3rd, 2022|2 min read

Case Study | Drilled-In Displacement Piles (DDM)

NYC – 75 STELCOR Piles for 8-Story Cantilevered Condos

July 30th, 2021|1 min read

Case Study | Drilled-In Displacement Piles (DDM)

Keeping it Clean in Washington D.C. With STELCOR

February 11th, 2021|1 min read

Helical Piles | Case Study | Helical Case Study

On the beaten PATH: More IDEAL Helical Piles In The NY/NJ Subway Stations

October 8th, 2020|0 min read

Limited Access | Case Study | Drilled-In Displacement Piles (DDM) | STELCOR

STELCOR For The First National Center

August 10th, 2020|2 min read

Helical Piles | Case Study | Helical Case Study

Helical Pile Foundations for COVID-19 Field Hospitals in New York

May 1st, 2020|1 min read

Case Study

NYC – East Village Homes See STELCOR Savings

January 21st, 2020|1 min read

Helical Piles | Case Study | Helical Case Study

IDEAL Helical Piles at the naval academy

September 17th, 2019|1 min read

Need Help?

Our team provides specialized deep foundation advice at no cost to you.

Let's Chat

Helical Piles | Case Study | Helical Case Study

1,321 Helical Pipe Piles for Lincoln Terminal in Natchez

September 13th, 2019|1 min read

Limited Access | Case Study | Drilled-In Displacement Piles (DDM) | STELCOR

295 STELCOR® DDM for the new 16-Story Gilbert in NYC

March 9th, 2019|1 min read

Helical Piles | Case Study | Helical Case Study

13.375″ Helical Pipe Piles For Western Canadas Largest Wind Project

December 14th, 2018|1 min read

Limited Access | Case Study | Drilled-In Displacement Piles (DDM) | STELCOR

A Boring Story – How to Save 6 Weeks, 50 Foot, and $500,000.00

August 3rd, 2018|2 min read

Case Study | Drilled-In Displacement Piles (DDM) | STELCOR

NYC – 126 STELCOR® Piles to 75’ for a 14-Story Addition at Draper Hall

May 1st, 2018|1 min read

Helical Piles | Historic Preservation | HELICAL SOE | Case Study | Helical Case Study

7″ Helical Pile Underpinning For A 100-Year-Old Community Center

April 4th, 2018|1 min read

Limited Access | Low Headroom | Case Study | Drilled-In Displacement Piles (DDM)

Cornell University – STELCOR® DDM for Increased Column Loading In The Historic Rand Hall

March 21st, 2018|1 min read

Limited Access | Case Study | Drilled-In Displacement Piles (DDM) | STELCOR

Keeping it Clean in Washington D.C. With STELCOR

February 2nd, 2018|1 min read