Search for topics or resources
Enter your search below and hit enter or click the search icon.
September 11th, 2020
0 min read
The Pennant, in Fells Point on Baltimore’s Inner Harbor, is a residential development that is currently under construction. The project includes new construction as well as the renovation of existing structures. The 2-story Wolfe Street warehouse is being converted into a parking structure and will have three stories of residential space added above.
The column loads for the building have to be increased to support the added weight of three additional floors. This is where the challenge of limited overhead access came into play. Luckily for the developers, this is one of the many instances where STELCOR Drilled-In Displacement Micropiles are a perfect option.
Full project case study coming soon. Watch this space.
Topics: