Tested to 100 ton ultimate with only .300” of movement at full design load.
OVERVIEW:
A new construction, 5-story residential building in Astoria NY. Helical piles were originally specified for this project.

23rd Street STELCOR Procomm (25)23rd Street STELCOR Procomm (36)

CHALLENGE:
The developer faced several challenges at this site. The biggest concern was the high water tables present. A redesign was issued, the loading was changed, and helical piles were rejected due to the high load restrictions placed on helical piles in the NYC metro area.

SOLUTION:
IDEAL teamed up with Rich Anastasio to offer Stelcor Drilled-In Displacement Micropiles as an alternative foundation solution. Stelcor Micropiles were a perfect fit not only from an engineering perspective, they were much more cost effective compared to alternative piles. After a 48-hour load test at full test load, there was essentially no movement.  Engineers on site told the installer they had never seen a test that went that well.


DOWNLOAD THE FULL CASE STUDY HERE.

See how Stelcor Drilled-In Displacement Micropiles can save your project.


 

23rd Street STELCOR Procomm (24)23rd Street STELCOR Procomm (7)

 

 

 

 

 

 

 

GENERAL CONTRACTOR:
GKC Industries
Port Washington, NY

INSTALLER:
Rich Anastasio/Procomm Systems
Phillipsburg, NJ

STRUCTURAL ENGINEER:
Wexler Associates
New York, NY

ARCHITECT:
PM Architecture
New York, NY

LOADS:
100 kips

SPECIFICATIONS:
STELCOR 1200
14” tip or drive plate
12” corrugated grout column
9” solid grout column
8” reverse auger
5.5” steel core
.361 wall thickness 80 ksi

SOILS + EMBEDMENT DEPTH:
25’

TIME FRAME:
6 days