# CASE STUDY | Long Beach, NY | 257 STELCOR Piles

 July 24th, 2015

 1 min read

 By [Bruce Stroyer](https://www.idealfoundationsystems.com/blog/author/bruce-stroyer)

![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/LONG-BEACH-COMFORT-STATIONS-finished-pile.jpg?width=1600&height=712&name=LONG-BEACH-COMFORT-STATIONS-finished-pile.jpg)

STELCOR DDM EXCEEDED THE REQUIRED CAPACITY AT ALMOST HALF THE DEPTH REQUIRED FOR AUGERCAST.

**OVERVIEW:**

The boardwalk and all of the facilities at Long Beach were washed away during Hurricane Sandy. The plans for rebuilding the boardwalk included restrooms, changing rooms, lifeguard stations, and concessions at seven locations along the boardwalk. Initially, there were 257 augercast piles specified for this project.

**CHALLENGE:**

The GC was facing time constraints and the top priority was to get the piles installed quickly and with minimal site mess.

**SOLUTION:**

IDEAL presented STELCOR as a cost-effective alternate to augercast piles. The [STELCOR](https://www.idealfoundationsystems.com/stelcor/) piles exceeded the required capacity at depths ranging from 15′ to 20′. That is around half of the 30’ depth that was required for the augercast piles which were initially specified for the project. No modifications were made to the installer’s existing equipment, and by eliminating spoils, there was minimal site mess.

**PRINT VERSION **

![Photo 4](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/Photo-4.jpg?width=1172&height=879&name=Photo-4.jpg)

**LOADS**  
50 kips/100 kips ultimate  
compression  
45 kips/90 kips ultimate uplift  
2.0 kips/4.0 kips ultimate lateral

**SPECIFICATIONS:**  
STELCOR 1200  
16” tip or drive plate  
12” corrugated grout column  
9” solid grout column  
8” reverse auger  
5.5” steel core  
.304 wall thickness 55 ksi

**SOILS + EMBEDMENT:**  
20’ max with STELCOR  
[View soils report](https://www.idealfoundationsystems.com/hubfs/CASE%20STUDY/Long%20Beach%20Comfort%20Station%20Borings.pdf)

**T****IME FRAME:**  
Foundations for 7 structures are  
being completed in 3 phases.

![LONG BEACH COMFORT STATIONS - stelcor pile cap](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/LONG-BEACH-COMFORT-STATIONS-stelcor-pile-cap.jpg?width=929&height=540&name=LONG-BEACH-COMFORT-STATIONS-stelcor-pile-cap.jpg) ![LONG BEACH COMFORT STATIONS - station 1](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/LONG-BEACH-COMFORT-STATIONS-station-1-300x163.jpg?width=348&height=189&name=LONG-BEACH-COMFORT-STATIONS-station-1-300x163.jpg)![LONG BEACH COMFORT STATIONS - stelcor cutoff](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/LONG-BEACH-COMFORT-STATIONS-stelcor-cutoff-300x207-2.jpg?width=275&height=190&name=LONG-BEACH-COMFORT-STATIONS-stelcor-cutoff-300x207-2.jpg)

 Topics:

[ Case Study ](https://www.idealfoundationsystems.com/blog/topic/case-study)

[ Drilled-In Displacement Piles (DDM) ](https://www.idealfoundationsystems.com/blog/topic/drilled-in-displacement-piles-ddm)

[ STELCOR ](https://www.idealfoundationsystems.com/blog/topic/stelcor)

 Don't forget to share this post:

<https://www.facebook.com/sharer/sharer.php?u=https://www.idealfoundationsystems.com/blog/case-study-long-beach-ny-257-stelcor-piles> <https://www.linkedin.com/shareArticle?url=https://www.idealfoundationsystems.com/blog/case-study-long-beach-ny-257-stelcor-piles&title=IDEAL+STELCOR+Piles+at+Long+Beach+NY&summary=IDEAL+STELCOR+MICROPILES+EXCEEDED+THE+REQUIRED+CAPACITY+AT+ALMOST+HALF+THE+DEPTH+REQUIRED+FOR+AUGERCAST.> <https://twitter.com/intent/tweet?text=IDEAL+STELCOR+Piles+at+Long+Beach+NY&url=https://www.idealfoundationsystems.com/blog/case-study-long-beach-ny-257-stelcor-piles> <https://pinterest.com/pin/create/button/?url=https://www.idealfoundationsystems.com/blog/case-study-long-beach-ny-257-stelcor-piles&media=https://47216011.fs1.hubspotusercontent-na1.net/hubfs/47216011/Imported_Blog_Media/LONG-BEACH-COMFORT-STATIONS-finished-pile.jpg&description=IDEAL+STELCOR+MICROPILES+EXCEEDED+THE+REQUIRED+CAPACITY+AT+ALMOST+HALF+THE+DEPTH+REQUIRED+FOR+AUGERCAST.>

## Related Articles

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Baltic%20St_.png?width=713&height=401&name=Baltic%20St_.png)

### STELCOR Supports a Complex Development Site in Brooklyn’s Gowanus Neighborhood

 May 18th, 2026|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-supports-a-complex-development-site-in-brooklyns-gowanus-neighborhood)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/16-777x246.jpg?width=777&height=246&name=16-777x246.jpg)

### STELCOR Piles Installed Adjacent to Elevated MTA for Lorimer House Project

 May 18th, 2026|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-piles-installed-adjacent-to-elevated-mta-for-lorimer-house-project)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/image-webp.webp?width=1350&height=900&name=image-webp.webp)

### NYC - 272 STELCOR Piles Installed for a 14-Story Development in Gowanus

 August 1st, 2025|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-272-stelcor-piles-installed-for-a-14-story-development-in-gowanus)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/86%20DELANCEY%20web(16)--jpg.jpeg?width=720&height=471&name=86%20DELANCEY%20web(16)--jpg.jpeg)

### NYC - 112 STELCOR® Piles to 30' for a 12-Story Mixed-Use Rental Building

 June 23rd, 2025|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-112-stelcor-piles-to-30-for-a-12-story-mixed-use-rental-building)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/INSTALL-SNIP-2-WEB.jpg?width=720&height=404&name=INSTALL-SNIP-2-WEB.jpg)

### 5.5″ HELICAL PILES FOR A HOSPITAL PARKING GARAGE RETROFIT

 December 28th, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/5-5-helical-piles-for-a-parking-garage-retrofit)

[![STELCOR® DDMS TOUCHING DOWN AT JFK AIRPORT](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/20220617_140517-WEB-scaled.jpg?width=2560&height=1920&name=20220617_140517-WEB-scaled.jpg)

### STELCOR® DDMS TOUCHING DOWN AT JFK AIRPORT

 October 31st, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-at-jfk)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/install-gap-2.jpg?width=2400&height=1354&name=install-gap-2.jpg)

### 42 STELCOR® DDMS FOR WIND TURBINES IN CALIFORNIA

 July 25th, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/42-stelcor-ddms-for-wind-turbines-in-california)

[![FLYING EXCAVATORS AND STELCOR DDM’S AT A PAPER MILL IN DULUTH, MN](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/duluth-3-web-1.jpg?width=900&height=505&name=duluth-3-web-1.jpg)

### FLYING EXCAVATORS AND STELCOR DDM’S AT A PAPER MILL IN DULUTH, MN

 June 29th, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/flying-excavators-and-stelcor-ddms-at-a-paper-mill-in-duluth-mn)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/20210611_100954-WEB.jpg?width=2048&height=1536&name=20210611_100954-WEB.jpg)

### 93 STELCOR DDM’S INSTALLED FOR A 7-STORY HOSPITAL ADDITION

 March 3rd, 2022|1 min read 

](https://www.idealfoundationsystems.com/blog/93-stelcor-ddms-installed-for-a-7-story-hospital-addition)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DSC00162-1.jpg?width=872&height=583&name=DSC00162-1.jpg)

### NYC – 75 STELCOR Piles for 8-Story Cantilevered Condos

 July 30th, 2021|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-75-stelcor-piles-8-story-cantilevered-condos)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DC-SEWER-2-150x150-1-1.jpg?width=150&height=150&name=DC-SEWER-2-150x150-1-1.jpg)

### Keeping it Clean in Washington D.C. With STELCOR

 February 11th, 2021|1 min read 

](https://www.idealfoundationsystems.com/blog/keeping-clean-washington-d-c-stelcor)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/PATH-WEB-1.jpg?width=436&height=325&name=PATH-WEB-1.jpg)

### On the beaten PATH: More IDEAL Helical Piles In The NY/NJ Subway Stations

 October 8th, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/on-the-beaten-path-more-ideal-helical-piles-in-the-ny-nj-subway-stations)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/FNC-rendering-web-150x150-1.png?width=150&height=150&name=FNC-rendering-web-150x150-1.png)

### STELCOR For The First National Center

 August 10th, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/stelcor-for-the-first-national-center)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/CHSB-26.jpg?width=900&height=506&name=CHSB-26.jpg)

### Helical Pile Foundations for COVID-19 Field Hospitals in New York

 May 1st, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/helical-pile-foundations-for-covid-19-field-hospitals-in-new-york)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/302-east-2nd-street-exterior-rendering.jpg?width=736&height=401&name=302-east-2nd-street-exterior-rendering.jpg)

### NYC – East Village Homes See STELCOR Savings

 January 21st, 2020|1 min read 

](https://www.idealfoundationsystems.com/blog/east-village-homes)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/IMG_1908-resize.jpg?width=640&height=480&name=IMG_1908-resize.jpg)

### IDEAL Helical Piles at the naval academy

 September 17th, 2019|1 min read 

](https://www.idealfoundationsystems.com/blog/ideal-helical-piles-at-naval-academy)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/lincoln-terminal-helical-piles-night.jpg?width=576&height=324&name=lincoln-terminal-helical-piles-night.jpg)

### 1,321 Helical Pipe Piles for Lincoln Terminal in Natchez

 September 13th, 2019|1 min read 

](https://www.idealfoundationsystems.com/blog/1321-helical-pipe-piles-for-lincoln-terminal-in-natchez)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/NYHC-awards_DraperHall_image4-910x1024-910x1024-1.jpg?width=910&height=1024&name=NYHC-awards_DraperHall_image4-910x1024-910x1024-1.jpg)

### 295 STELCOR® DDM for the new 16-Story Gilbert in NYC

 March 9th, 2019|1 min read 

](https://www.idealfoundationsystems.com/blog/its-gonna-be-a-gilbert)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/Blackspring-Ridge-Wind-Project-Vickars-Image-7.jpg?width=640&height=360&name=Blackspring-Ridge-Wind-Project-Vickars-Image-7.jpg)

### 13.375″ Helical Pipe Piles For Western Canadas Largest Wind Project

 December 14th, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/13-375-helical-pipe-piles-300-megawatt-solar-project-alberta)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/86-DELANCEY-5.jpg?width=600&height=800&name=86-DELANCEY-5.jpg)

### A Boring Story – How to Save 6 Weeks, 50 Foot, and $500,000.00

 August 3rd, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/1972-2)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/draper2.jpg?width=640&height=480&name=draper2.jpg)

### NYC – 126 STELCOR® Piles to 75’ for a 14-Story Addition at Draper Hall

 May 1st, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/nyc-126-stelcor-micropiles-to-75-for-a-14-story-addition-at-draper-hall)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/Spiegel-Community-Center-Helical-Piles2.png?width=872&height=583&name=Spiegel-Community-Center-Helical-Piles2.png)

### 7″ Helical Pile Underpinning For A 100-Year-Old Community Center

 April 4th, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/7-helical-pile-underpinning-100-year-old-community-center)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DSC01761-web.jpg?width=872&height=583&name=DSC01761-web.jpg)

### Cornell University – STELCOR® DDM for Increased Column Loading In The Historic Rand Hall

 March 21st, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/cornell-university-stelcor-ddm-increased-column-loading-historic-rand-hall)

[![](https://www.idealfoundationsystems.com/hs-fs/hubfs/Imported_Blog_Media/DC-SEWER-2-1024x576-2.jpg?width=1024&height=576&name=DC-SEWER-2-1024x576-2.jpg)

### Keeping it Clean in Washington D.C. With STELCOR

 February 2nd, 2018|1 min read 

](https://www.idealfoundationsystems.com/blog/keeping-it-clean-washington-d-c-stelcor)

```json
{
  "@context" : "https://schema.org",
  "@type" : "BlogPosting",
  "author" : {
    "@type" : "Person",
    "name" : "Bruce Stroyer",
    "url" : "https://www.idealfoundationsystems.com/blog/author/bruce-stroyer"
  },
  "dateModified" : "2025-01-20T18:41:16.525Z",
  "datePublished" : "2015-07-24T18:34:56.000Z",
  "headline" : "IDEAL STELCOR Piles at Long Beach NY",
  "image" : [ "https://www.idealfoundationsystems.com/hubfs/Imported_Blog_Media/LONG-BEACH-COMFORT-STATIONS-finished-pile.jpg" ],
  "mainEntityOfPage" : {
    "@id" : "https://www.idealfoundationsystems.com/blog/case-study-long-beach-ny-257-stelcor-piles",
    "@type" : "WebPage"
  },
  "publisher" : {
    "@type" : "Organization",
    "logo" : {
      "@type" : "ImageObject",
      "url" : "https://www.idealfoundationsystems.com/hubfs/ASSETS/logos/Ideal-Logo.png"
    }
  }
}
```